Demolition with Coring in Active Factory

Anasayfa » Demolition with Coring in Active Factory
About Active Factory Demolition

It is the demolition project of the 26-meter straw tower in the middle of the factory in Marmara Kağıt Bilecik Facilities, which works 24 hours with more than 1500 personnel.

In order to demolish the building, which has completed its service life and poses a risk to the facility, the “cut-down demolition” method was used. Cutting was carried out with coring and small hand tools.

The pieces cut from the building were lowered with the help of a heavy tonnage crane and transported in pieces.

This Project; It was carried out without stopping the factory activities and in compliance with the OHS rules.