tren
tren

Facility Demolition

Anasayfa » Facility Demolition

We prepare a demolition plan and a demolition report for the dismantling / demolition of structures such as Sports Facility, Gas Station, and we comply with this plan.

How Do We Progress?

During the Discovery carried out before the Facility Demolition, all possible risks are examined and a document file is created. In this file; The structure of the project area, environmental factors, the arrival and departure routes of the construction equipment, the arrival and departure routes for the transport of rubble are included. Moreover; As a result of this document file, the demolition method is determined and a demolition plan is created.

We Prepare a Demolition Plan

Our engineers, who perform site exploration, create an advanced demolition plan and present it to your company. This demolition plan includes the full feasibility of the site, the demolition method, the construction equipment to be used and the routes. Demolition proceeds with this plan

Controlled Demolition

Controls and inspections are carried out by our engineers from the first stage of demolition to the completion stage. This control takes place in the field.

Makas ile Yıkım

Mini Makina ile Yıkım

Ekskavatör ile Yıkım


We carry out the demolition of the building in your project area, under the high level of security measures, under the control of the Engineer, by designing it. We take the risk under control at all of these stages and make you feel the difference of professionalism.


What is Demolition?

Demolition is the process of destroying the static integrity of any building that has completed its service life and turning the area on which the building is located into a land again.

What is Safe Demolition?

Safe demolition is the demolition of the building, which is carried out by closing the perimeter of the building, taking all precautions and using the appropriate methods and machinery for the demolition of the building.


Why Us?
  • 1- We take all precautions
  • 2- We Determine the Appropriate Method
  • 3- We pay attention to the environment
  • 4- We carry out controlled demolition

Professional Choice